Church renovation

Home ยป Church renovation

We’re on mission at Benoni Baptist Church to reach Benoni with the gospel, and equip all for life. Our facilities enable that goal.

It’s very clear that the Lord is working in our community. One of the ways is through the imagination and generosity of our members. Over the past few months a number of people have offered ideas, dreaming of facility upgrades and improvements. Others have offered to fund a number of projects. Our executive, and church, have also approved a number of projects.

Below is a list of potential future projects, and projects that have been completed. We have also included a number of maintenance tasks which need to be completed. The intention is to bring the congregation into our confidence as we endeavour to lead Benoni Baptist Church to reach Benoni with the gospel, and equip all for life.

All potential projects will go through our standard decision making processes.

Our hope that our members will rally to this renovation effort. Some will dream. Some will give. Some will do. This renovation effort will not be successful because of the generosity of a few, but with the sacrifice of the many.

Lobby

Remove cornerstone, make the wall good and paint.

Remove the A.B. Brett commemorative stone and relocate it to the garden of remembrance, make the wall good and paint.

Rhinolite, plaster & paint undercoat side walls.

TV or projector for rolling slides and information.

Entrance to main hall

We need a pedestrian mat between lobby and fellowship hall, set into the concrete to match the pedestrian mat at the front entrance.

Straighten up the cross on the wall outside the lobby.

Install cornerstone to the left of the entrance.

Move centenary plague under the cornerstone.

Main hall

Replace the pews with chairs in the main hall.

New doors for the baptismal bath.

Update our CoC’s.

Mothers’ room

Airconditioning.

Paint.

Decorate with babies theme.

Toilets

Clean / Paint / varnish toilet doors in the fellowship hall.

Roofing need major maintenance.

Library

Supply and Install carpets.

Fellowship Hall

Remove curtains at kitchen nook; supply and install aluminium & glass folding stacking window to close off kitchen.

Paint the passage and toilets in the Fellowship hall.

Repair / replace ceiling boards in Fellowship Hall where sagging.

Sliding doors and tented area.

Chase walls and install conduits in wall with lights witches and plug boxes and cabling concealed (neat solution).

Supply and Install Acoustic / Decorative wall panels on back wall for sound dampering (to design).

Supply and Install Acoustic / Decorative wallpanels on side walls, at class rooms with cut-outs for cabling and switches (to design) 

Supply and Install new glass & aluminium interior doors (5x single & 1x double).

Supply and Install carpet tiles.

Supply and install venetian blinds to exterior windows.

Supply and install new carpet tiles on stages.

Repair the pool table.

Sunday school classes

Pinboard (Enviro PET) – supply and install onto melamine panel next to BIC.

Venetian Blinds.

New Handles on built-in cupboards.

New seating benches for parents.

Carpets.

Glass doors on boys Sunday school rooms.

Kitchen

Supply and Install 3x glass & aluminium doors (to kitchen, store room & hall).

Replace water damaged kickplates.

Replace swing door cupboards with dustbin drawers (door on runners).

Buy and install dishwasher (Hygiene issue).

Purchase another perculator or two.

Store room

Tidy up the wiring.

Demolish wall between meeting room and store room, build in a lintel, plaster, rhinolite and paint walls (get structural engineer’s approval for removal of wall ??).

Venetian blinds .

New boardroom table and chairs.

Exterior

3 outside benches.

Repair broken fascia boards, check gutters and paint.

Paint entrance to fellowship hall.

Repair roof tiles.

Garden tap.

Outlet for the baptismal font.

Office block

Repair broken fascia boards, check gutters and paint.

Paint outside building.

Check and Paint inside if required.

Roof-tiles.

Conversion of single room accommodation.

Conversion of family accommodation.

Ramp to front entrance.

Ramp to garden of remembrance.

Update our CoC’s.

The Coffee Bar

Decorate – coffee bar theme.

Paint outside.

Light outside The Coffee Bar.

Parking

Slab the bed.

Level grass parking.

Add parking exit signs.

Disabled parking road signage.

Banners for parking and main hall entrance.

Maintenance tasks

Fire extinguisher needs to be rehung in the lobby.

Fire extinguisher needs to be painted, rehung, and signs need to be installed in the main hall storeroom.

Supply and install new anti-slip stair strips to slate stairs (clear strips) in hallway.

Soap brackets need to removed, and the wall repainted in passage toilet.

Hang up Soap Dispenser and Hand paper towel stand in passage toilet.

Electrician to reconnect the lights in the main hall storeroom (needs scaffolding).

Electrician to replace the light in chandelier in the main hall (needs scaffolding).

Electrician to replace handle on the electric box in the main hall.

Paint baptismal pool.

Front fan needs to be balanced in the main hall (needs scaffolding).

New doorhandles on fire cupboard.

Trunking for wiring to speaker (trunking and wiring) in mother’s room.

Clean light fittings in library.

Install ceiling fan in library.

Spray wicker chairs and table white (one of the chairs needs to be fixed) in library.

Install a new light fitting in library storeroom.

Plugs on pillars in fellowship hall.

Clean light in kitchen.

Fix broken cupboards (identify broken cupboards, install bin board, new skirtings) in kitchen.

Replace leaking tap in kitchen.

Tap in men’s toilet needs to be repaired fellowship hall.

The light needs to be fixed in fellowship hall toilet.

Clean urinal, repair rusted pipe, and paint in fellowship hall toilet.

Garden pots need to be painted.

Gutter by fellowship hall needs to be repaired.

Jungle gym needs to be renovated (pool noodles, sanding, paint).

Hooks to hold all doors around the campus.

Clean and repaint decayed, clogged gutters.

Additional disabled parking signs.

All exterior lights need to be checked, and replaced if necessary.

Paint ceiling outside fellowship entrance.

Fill electrical circular sockets in the reception.

One plate on the stove, and the knobs.

Roofing beams need attention.

Professional services

We enlisted the services of an architect to draw up plans for the bathrooms and access to the fellowship hall.

Completed projects

May 2026

We enlisted the services of Vanessa Kramer, an interior designer.

June 2026

Painted out the lobby.

July 2026

Removed the beams in the lobby.

Paint fire hydrant cupboard doors in the lobby.

Painted the main hall except brickwork.

Put up new lights in the lobby.

Painted the brickwork in the main hall.

Painted the ascent walls in the lobby.

Upgraded the inverter and battery.

Painted the toilets in the hallway.

Painted the library.

Painted the white bookshelf units in library.

Repaired cornices and paint ceiling in library.

Fixed frosted vinyl pattern on sliding door in library.

Painted the kitchen.

Repainted parking bays.

Reconfigure parking bays near the fellowship hall.

August 2026

Painted the fellowship hall.

Major maintenance on lobby roofing.

Signage through campus.

Purchased 2 servers for the lobby.

Get 3 artificial palms for existing white pots in main hall.

Painted the back wall in the main hall Obsidian.

Paint shelving unit in the fellowship hall white.

Installed frost vinyl pattern on sliding doors in the fellowship hall.

Conducted a health and safety inspection for wooden slats in the fellowship hall.

Removed the wooden slats in the fellowship hall.

Removed the whiteboard from the fellowship hall.

Plastered and painted back wall of the fellowship hall.

Upgrade the inverter and battery and solar.

September 2026

New door sign for the Mother’s room.

Directional signs to Toilets and Fellowship Hall / Sunday school classes.

John 8:12 on the accent wall.

Psalm 119:105 on the accent wall.

Signage to fellowship hall toilets.

Paper towel dispenser installed into toilet in fellowship hall.

New signage for bookshelves in the library.

Re-upholster chairs in the library.

Rhinolite and paint the rear fellowship hall.

Sanded & varnish wooden skirtings in fellowship hall.

Coffee perculators.

Replace putty on all external windows and paint.

Children’s play area fence.

Add additional bays by office block.

October 2026

Remove bar from the residence.

Remove braai from the residence.

Remove umbrella stand from the residence.

Paint inside The Coffee Bar.

Knock through door to toilets in The Coffee Bar.

Renovate the toilets in The Coffee Bar.

Partner with us

How do we get the dreams and projects above done? Well, through the giving of our people. Over the past year our members have been so faithful in their giving. And generous too. I’m reminded of 1 Chronicles 29:14, But who am I, and who are my people, that we should be able to give as generously as this? For everything comes from you, and we have given you only what comes from your own hand.